This course is designed to provide comprehensive training on track inspection techniques and standards for individuals working in the railway sector. Participants will gain a deep understanding of Network Rail standards, track construction principles, and the methods used to identify and rectify track geometry faults. Upon completion, participants will be equipped with the knowledge and skills necessary to ensure the safety and reliability of railway infrastructure.

  • To familiarize participants with the Network Rail Standards, Specifications, and Track work instructions related to track geometry.
  • To develop a clear understanding of track construction, maintenance requirements, and geometrical tolerances for plain line and switches and crossings.
  • To equip participants with the ability to identify and measure track geometry faults using appropriate methods and techniques
  • To train participants in the restoration of track geometry to meet specified standards.

 

Day 1: Introduction to Track Geometry

  • Overview of track geometry principles
  • Network Rail standards and specifications
  • Track construction methods and materials
  • Plain line geometry and tolerances
  • Switches and crossings geometry and tolerances

Exercise: Practice identifying track components and measuring basic track parameters.

 

Day 2: Track Inspection Equipment and Techniques

  • Track inspection equipment (e.g., theodolite, level, tape measure)
  • Track inspection methods (e.g., manual, automated)
  • Data collection and recording
  • Basic data analysis

Exercise: Practice using track inspection equipment to measure track parameters.

 

Day 3: Track Geometry Faults and Their Causes

  • Common track geometry faults (e.g., alignment, elevation, twist, cant)
  • Causes of track geometry faults (e.g., traffic, environmental factors, maintenance practices)
  • Fault identification techniques

 

Day 4: Tract Geometry Measurement and Analysis

  • Advanced track geometry measurement techniques
  • Data analysis and interpretation
  • Fault severity assessment
  • Prioritization of maintenance tasks

 

Day 5: Track Geometry Restoration

  • Track geometry restoration methods (e.g., tamping, lifting, straightening)
  • Equipment and tools used for restoration
  • Restoration planning and execution
  • Quality control and verification
  • Track Inspectors
  • Track Maintenance Personnel
  • Railways Engineers
  • Supervisors and managers in the railway sector

الجدول الزمني

  • 5 Days - Sep 14, 2026
  • english
  • face to face
  • Singapore
  • $ 5,950
سجل الان
  • 5 Days - Sep 20, 2026
  • english
  • face to face
  • Cairo - Egypt
  • $ 3,900
سجل الان